In order to cross Hawk’s Hole Creek, we needed something other than a couple of planks across the bottom of the canyon. A bridge was the answer. Here is the crew constructing the bridge.
- The bridge site
- Preparing for the concrete
- Forms ready for concrete
- Concrete truck feeding the pumping truck
- concrete pumping truck
- laying concrete hose
- Concrete pumping hose running through woods
- Concrete hose ready to pour
- Filling the forms
- Forms filled
- Stringers installed–starting on deck
- Decking the bridge
- Deck almost installed
- Feeding the crew onsite
- Deck almost finished
- The crew