The Outback trail (that portion of the trail that runs west from Hansville Road to Post #18) is a bit wet in places. We’ve been gradually bridging the wet areas. The Chatham part of the trail (that trail that runs from Hansville Road east to Thors Rd.) had had quite a bit of mud problems, especially through the section with the large cedar trees.
- Putting hardware cloth on the old bridge
- The old bridge made slip-resistant by hardware cloth
- The project site–before construction.
- Preparing the end of the old bridge in Chatham
- Gotta get them spaced right
- Laying down the stringers
- The finished project in Chatham
- Joining two sections of bridge
- Our first client!
- The crew in Chatham
- Construction in the Outback
- Fastening the deck
- Placing the decking in the Outback
- Fastening the decking in the Outbaack
- The finished product in the Outback
- Outback decking
- The finished project in the Outback